Showing posts with label House. Show all posts
Showing posts with label House. Show all posts

Sunday, November 6, 2011

Getting the house painted

We are getting the house painted. They are almost done with the front of the house. They started priming the lower porch yesterday. Luis has done a great job and will post his information soon. painting your house is obviously an investment. Luis and his men have made that an easy decision with their quality work.

Wednesday, August 11, 2010

Converted Garage Patio

When you have 1 car and a very narrow driveway do you really need a 2 car garage? Nope. The Wife made the decision to cut the garage in half. I thought it was a great idea. Now we just need to get patio furniture and a ceiling fan (on order). Part garage and part patio with a roof. Needless to say Luis and his team banged this out in just about 7 days. Looks great!

Thursday, June 4, 2009

Blowing in the Insulation









We decided to fifnish up the insulation on the third floor so it was cooler in the summer and warmer in the winter. This is the crawl space that is at either end of our bedroom. 4 feet wide and 4 feet high. One day we will figure out what to do with this space. Walk in closet, space for dresser, etc.

They insulated the walls



Then they laid down a think coat of snow. They did this in the attic as well. The pictures weren't as great.






Since it was the third floor they had to blow the insulation in from the inside. Lots of patching and repainting. The clean up took about a day and about 95% of it was done by the wife. While the insulation costs a pretty penny, we ended up getting about 25% back from National Grid. We also might qualify for more if our heating bill goes down significantly.

Wednesday, March 5, 2008

Now that the Inside of the House is done...

It's been almost two months since the renovation on our house was completed. It's been really quiet. As the weather warms up "the Wife" starts to get ideas. So, we are starting to think about some outside stuff that needs to get done:

  • Garden in front and back
    • the good news here is that are tenant is interested in gardening. Less work for Jorin
  • Fence redone in the backyard
    • the bad news here is that 40 or so feet is really expensive
  • Garage Needs to be "Organized"

Anyway you look at it seems like it could be a busy spring here on Rugby Road.

Saturday, November 3, 2007

Oh, Sh**! Part 2

If you were a fan of Oh! Sh*** The Joys of Ownership, well here comes part 2. Last night the gurgling returned. The only difference this time is that we were on our own- No Uncle John or my faithful Father In Law -- Kaz!. It didn't make it back to and out of the toilet this time-- That is the good news.
Around 10pm we were alerted by our diligent tenant-- Kelly-- that she heard gurgling again. After a quick call to review instructions with Kaz, I was off to the basement to get it done.

- I opened up the sewer drain
- Instead of back up in the bathroom my drain was filled to the rim, and it wasn't Brim
- Note: You always knock off the drain cap closer to the street.
- I did this and the drain pit started draining.
- As soon as muck cleared I began plunging the stuck pipe.
- Something gave way and we were back in business.
- I cleared the remaining Muck out of the drain.

Time to finish-- roughly 20 minutes.

Most notably, I went down to the basement at least 5 times today. Call me paranoid-- It makes sense. Next up-- the plumber comes to figure out why we have had a crappy couple of weeks in the basement.

Tuesday, October 16, 2007

The Kitchen!!!

The kitchen is gutted. I really did not think we were gutting it but I guess my ideas and my wife's ideas are two different ideas.
Cabinets are on order. They should be here in, hopefully, in 2 to 3 weeks. The electrician has started working. Frank plumber comes tomorrow to move the gas line for our stove and for the dryer on the 3rd floor.
I guess as a first time home owner and a first time renovator you really do not realize what goes in to doing a kitchen and how many steps are involved. You have to to follow a certain order and each steps depends on the other. Some things like the counter top cannot be ordered until after the cabinets are installed. Then we have to wait two weeks for the counter top to be cut and installed, then we can install the back splash.
You need a lot of patience to do a kitchen. No matter how good your contractor is, if you want a nice kitchen, you want nice materials (i.e. granite counter tops, etc), then you have to wait for them.
I think it will be worth it all in the end.

Just hoping it will be done for Christmas. The wife is planing a big party!!!

Saturday, October 6, 2007

Saturday, September 15, 2007

The Boys Room

The first room is ready in the duplex. Six Pack and I banged this out yesterday. The "Master Suite" should be ready today.

Tuesday, August 7, 2007

All Quiet

All Quiet... Until you open the door.